Fermenter Project

Post Reply
User avatar
Dutch
Brewmaster
Posts: 1248
Joined: Wed Jul 11, 2007 8:54 pm
Location: Evansville

Fermenter Project

Post by Dutch » Sun Sep 09, 2007 6:00 pm

Finally got to putting the fermenter together with control.
Got to 61 deg F with 84 deg F ambient.
Process uses one 75 Watt Peltier [with dould heat sink and also with two muffin fans. Box is constructed of 2 inch riged styrofoam essentially a 24" cube
Should do the trick. Three photos attached
[albumimg]221[/albumimg]
[albumimg]219[/albumimg]
[albumimg]220[/albumimg]

User avatar
Dwayne_Delaney
Brewmaster
Posts: 1446
Joined: Wed Dec 28, 2005 10:09 pm
Location: Henderson, KY (the d is silent)

Post by Dwayne_Delaney » Tue Sep 11, 2007 9:24 pm

Looks great! Can't wait to taste the product.
Dwayne Delaney

"Beer is not a good cocktail-party drink, especially in a home where you don't know where the bathroom is"
Billy Carter

Post Reply