All gas lines now done, all liquid lines in place, cooler is checked and leak-free, all 12 taps are in place, tank drain and three tray drains lines are finished. Even got the cooler lid restraint fixed. I just need to add fittings to cold plates and liquid lines as well as to add the second cold plate. I will flush out all lines with clean water and we should be ready for final test during weekend of 7/19. Could use some assistance with that. Will need a corny + some sanitizer and CO2 bottle as well. I'm pretty sure that Jack has all remaining materials under control. I now have the 5/16" beer outlet fittings.
[albumimg]334[/albumimg],[albumimg]333[/albumimg],[albumimg]332[/albumimg]
Beer Cart Ready For Test July 18
- Dutch
- Brewmaster
- Posts: 1248
- Joined: Wed Jul 11, 2007 8:54 pm
- Location: Evansville
- Dwayne_Delaney
- Brewmaster
- Posts: 1446
- Joined: Wed Dec 28, 2005 10:09 pm
- Location: Henderson, KY (the d is silent)
- Chris Norrick
- Brewmaster
- Posts: 2544
- Joined: Fri Dec 02, 2005 3:21 pm
- Location: Evansville, IN
- Contact: